Pennsylvania Turnpike- 2002

Picture 1
Overpass shot of the Turnpike with trucks passing
Picture 2
View of our paver and crew from alongside the roadway.
Picture 3
Our roller operator packing down the asphalt to meet DOT specs.
Picture 4
An inspector checking compaction to meet DOT specs.

Picture 5
An overpass shot showing our truck along the work area.
Picture 6
Our excavator loading trucks with excess material.
Picture 7
Our roller with an 18-wheeler passing by the crew.
Picture 8
The whole crew takes control with inspectors watching by.
 
 
 
Important Notices:
*Asphalt at the Hollidaysburg Plant may not be available at certain times. Please Call the main office in Hollidaysburg before arriving to make sure production is scheduled. Call (814) 695-5021
**Asphalt facilities located in Ganister schedule shutdown at 4pm and earlier. Please call before 4pm if you need to pick up asphalt. Otherwise, calling later may result in the plant already being closed for the day.