Sub-Base Needed Driveway - 2002

Picture 1
The driveway with the second layer of 2-RC base.
Picture 2
The driveway with the second layer of base stone material.
Picture 3
This driveway needed a full makeover.
Picture 4
This is the first layer of sub-base stone. Larger material.

Picture 5
A nice shot of the landscaping that finishes the job off well.
Picture 6
A skid-loader is used to place the first layer of base stone.
   
   
 
 
 
Important Notices:
*Asphalt at the Hollidaysburg Plant may not be available at certain times. Please Call the main office in Hollidaysburg before arriving to make sure production is scheduled. Call (814) 695-5021
**Asphalt facilities located in Ganister schedule shutdown at 4pm and earlier. Please call before 4pm if you need to pick up asphalt. Otherwise, calling later may result in the plant already being closed for the day.